Background Image
Previous Page  2 / 4 Next Page
Basic version Information
Show Menu
Previous Page 2 / 4 Next Page
Page Background

Position #1 March 2017

The commissioning of Magasin 6

(3,000 m

2

) for processing

Geminor’s SRF bales began.

SCA increased volumes

to the Port of Oxelösund from

the UK. We are preparing to upgrade the terminal equipment

for delivery in 2017.

New recruit

for the steel port’s management team.

Sören Lindby was appointed as new area manager.

The conveyor belt system for dry bulk

are working better

than ever thanks to preventive maintenance, which has also

increased our quality assurance. The operators first do an

inspection of the facility once a week. The maintenance

technicians do a more thorough inspection to prevent errors

and shortcomings.

New RORO traffic started

with SOL Lines which calls at the

port every two weeks. The Port of Oxelösund is included in

the Finland–UK–Zeebrugge–Finland flow. Oxelösund now

has three regular routes to/from the continent and the UK.

Planning started

for the odour purification of oil storage

caverns. As a safety measure, even the oil storage facility under­

went a risk classification with respect to dangerous gases.

New agreement with Vattenfall

for the management of

biofuels (recovered wood chips, forest wood chips, bark,

logs, etc.) in the port was signed. In other news we were

selected to take care of the storage and transport of fuels

to Nyköping. In doing so we linked yet another business to

our concept of being “The All Inclusive Port”.

Q1

Q2

Photo: Bobo Lindblad

Photo: Bobo Lindblad

Photo: Janne Höglund